This is the second time i take my ride on the ETS since its introduction early August 2010.
Depart:Kuala Kubu Bharu
Arrival:Seremban
Price:RM20
The train again arrive late at the station about 11 minutes (Depart time:1537).Along the way, the train eventually stop halfway for about 15 minutes( suspect electrical failure).The train however able to reach Seremban at 1540(only about 10 minutes late from the schedule)
It is very obvious that ETS main customer will be mainly the passenger from Ipoh.KTM Commuter still will be the more prefer choice of transportation if ETS did not reduce its price.KTM should think promotional campaign for frequent and loyal customer .